Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Apr 27, 2022     Map sensor plumbing - (3 hours)       Category: Engine
Fabbed/bent 1/4” tubing to connect ElectroAir MAP sensor to the manifold transducer. Measured, installed the connectors, flared the ends and drilled through hole in firewall to connect to the MAP sensor on cabin side. Also mapped out location for the Advanced Flight MAP sensor and fabbed up some aluminum washers to support the plumbing. Made a little stub of 1/4” tubing to connect to the ElectroAir MAP.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.